Explorer

Power Demand Falls, Renewables Shine: India Sees Record Green Energy Share In June

Power demand/peak demand declined 4 per cent/7 per cent in May and declined 1 per cent/1 per cent in the first 10 days of June, respectively.

The decline in power demand, together with continued renewable capacity additions the last year, caused the share of renewable energy generation in India jump to 17 per cent in May and to 19 per cent in first 10 days of June — compared to 13 per cent/14 per cent in May/June last year, respectively, an HSBC report showed on Friday.

Large base and excess rainfall cause decline in power demand. Power demand/peak demand declined 4 per cent/7 per cent in May and declined 1 per cent/1 per cent in the first 10 days of June, respectively.

This was the result of significantly above average rain levels in May.

Owing to the must-run status of renewables, thermal plants had to back down reducing the plant load factor (PLF) to 65 per cent in May (versus 72 per cent last year).

“Accordingly, coal stocks at power plants reached a significant 61m tonnes (21 days of demand versus 17 days at the same time last year). This also resulted in power prices during solar hours dropping to zero on 25 May. Power deficits, accordingly, remained negligible through the month,” the report mentioned.

Also Read : Gold Rate Today (June 14): Check Out Gold Prices In Delhi, Mumbai, Bengaluru, Ahmedabad, More Cities

Government is backing storage. To solve the intermittency issue of renewable energy, batteries are critical to control curtailment, improve renewable energy offtake, and improve efficient use of existing coal plants.

The government announced a slew of measures, doubling down on battery storage: announcing a Rs 54 billion of additional viability gap funding (VGF) for 30 GWh of battery storage.

This amounts to $21 per kwh of government incentives for putting up new battery storage systems. Out of the 30GWh, 25GWh of storage capacity will be allocated to states and 5GWh to NTPC.

This is in addition to the Rs 37 billion of existing VGF under which the existing 13GWh of storage is under implementation.

“Further, the government also extended the waiver of Inter-State Transmission (ISTS) charges for pumped storage plants (PSP) (construction awarded before June 2028) and co-located battery storage (BESS) for projects (commissioned before June 2028). This will help accelerate the take-up of battery tenders - nearly 10GWh of BESS tender capacity has been awarded since March 2024,” according to the HSBC note.

(This report has been published as part of the auto-generated syndicate wire feed. Apart from the headline, no editing has been done in the copy by ABP Live.)

Top Headlines

‘If You Misuse Your Visa...': US Embassy Warns B1/B2 Holders- Check Details
‘If You Misuse Your Visa...': US Embassy Warns B1/B2 Holders- Check Details
Turkman Gate Violence: Delhi Police On High Alert Ahead Of Jumma Namaz
Turkman Gate Violence: Delhi Police On High Alert Ahead Of Jumma Namaz
'Until Mamata Banerjee Arrived With Police…': ED Levels Serious Allegations, Moves High Court
'Until Mamata Banerjee Arrived With Police…': ED Levels Serious Allegations, Moves High Court
Greater Noida Residents Fall Ill After Consuming Contaminated Water: Reports
Greater Noida Residents Fall Ill After Consuming Contaminated Water: Reports

Videos

Breaking News: Maharashtra Politics Shifts: Congress Suspensions Boost BJP Ahead of Local Body Polls
Breaking News: Delhi Police Probe Reveals Social Media Role in Turkmen Gate Violence, YouTuber Salman Under Scanner
Breaking News: PM Modi Shares Pictures of Somnath Visit as ‘Somnath Swabhimaan Parv’ Begins
Breaking News: Inside Story of Turkmen Gate Bulldozer Action Near Faiz-e-Ilahi Mosque in Delhi
Breaking News: India’s GDP Expected to Grow at 7.4% This Fiscal Year, PM Modi Calls It Positive News

Photo Gallery

25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Embed widget