Commercial operations for the first phases of Mumbai Metro Corridors 9 and 2B began on Wednesday morning, a day after their inauguration.
Mumbai Metro Line 9, Line 2B Phase 1 Begin Operations, Connectivity Gets Major Boost
Mumbai Metro Lines 9 and 2B started commercial operations on Wednesday, enhancing suburban and Harbour Line connectivity.

- Mumbai Metro lines 9 and 2B now operational.
- Line 9 connects Mumbai suburbs to Thane city.
- Line 2B provides first metro access on Harbour Line.
Commercial operations on the first phases of Mumbai Metro corridors 9 and 2B began on Wednesday morning, a day after Maharashtra Chief Minister Devendra Fadnavis inaugurated the mass-transit routes, officials said. While the Metro 9 marks the first direct connectivity between a suburb in Mumbai and a part of Thane city in the metropolitan region, the Line 2B will provide the first metro connectivity on the Harbour Line in Mumbai.
The 5.6-km elevated Phase 1 stretch of Metro Line 9 comprises four stations -- Dahisar East, Pandurangwadi, Miragaon and Kashigaon. The 5.53-km Phase 1 of Metro Line 2B has five stations, including Deshbhakt N G Acharya Udyan (Diamond Garden), Chhatrapati Shivaji Maharaj Chowk, Deonar, Mankhurd and Maharashtra Nagar–Mandale.
According to the Mumbai Metropolitan Region Development Authority (MMRDA), Line 9 is expected to cut travel time between Mira-Bhayandar in Thane district and Mumbai to around 30 minutes from the current one to two hours. Built at Rs 6,607 crore, it will eventually provide seamless connectivity to south Mumbai through interlinking with other lines.
With the addition of the two new lines, Mumbai’s operational Metro network has expanded to six corridors, including Line 1 (Ghatkopar-Andheri-Versova), Line 2A (Andheri West-Dahisar East), Line 7 (Dahisar East-Andheri East) and the underground Line 3 (Colaba-Bandra Kurla Complex-SEEPZ).
As per MMRDA, the revised timetable for Line 2A and Line 7 came into effect on Wednesday, aimed at improving frequency, predictability and overall commuter experience.
It said that with the inauguration of Line 9, Metro Line 2A will now operate as a standalone corridor between Andheri West and Dahisar East, with services from 5.50 am till around 11 pm and a peak frequency of about six minutes.
The integrated Line 7-9 corridor (Gundavali to Kashigaon), spanning 19.79 km, will operate from 5.50 am to 11 pm, with a peak frequency of under six minutes and 276 services on weekdays.
Metro Line 2B (Phase 1) services commenced at 6 am and will run till around 10.30 pm at intervals of approximately nine-and-a-half minutes, operating 209 services daily, according to officials.
MMRDA said the integration of Line 7 with Line 9 enables direct connectivity from Andheri East to Mira-Bhayandar, while Lines 2A and 7 will function as separate corridors.
A seamless interchange facility at Dahisar station will allow passengers to switch between Lines 2A and 7 without exiting the “paid” (ticketed) area.
(This report has been published as part of the auto-generated syndicate wire feed. Apart from the headline, no editing has been done in the copy by ABP Live.)
Before You Go
CRIME ALERT: Maharashtra Cracks Down on Illegal Liquor as Death Toll in Toxic Alcohol Case Rises
Frequently Asked Questions
When did commercial operations begin for Mumbai Metro Corridors 9 and 2B?
What is significant about Metro Line 9?
Metro Line 9 marks the first direct connectivity between a Mumbai suburb and a part of Thane city in the metropolitan region.
What is significant about Metro Line 2B?
Line 2B will provide the first metro connectivity on the Harbour Line in Mumbai.
How much is the estimated travel time reduction for Line 9?
Line 9 is expected to cut travel time between Mira-Bhayandar and Mumbai to around 30 minutes, down from one to two hours.
What is the new operational frequency for Metro Line 7-9?
The integrated Line 7-9 corridor will operate from 5:50 am to 11 pm with a peak frequency of under six minutes and 276 services on weekdays.

























