Explorer

Karnataka Deputy CM Shivakumar Backs Silk Board–Hebbal Tunnel Road Project, Tejasvi Surya Calls It 'Unscientific'

BJP MP Tejasvi Surya, dismissed the Silk Board to Hebbal tunnel road project as unscientific and financially unviable, while Shivakumar backed it, saying Bengaluru "deserves better".

Bengaluru, Jun 22 (PTI) Karnataka Deputy CM D K Shivakumar on Sunday backed the proposed tunnel road project from Silk Board to Hebbal, claiming it would transform mobility in Bengaluru, while BJP MP Tejasvi Surya calls it unscientific.

In a post on 'X', Shivakumar said, "Your time matters. We’re building with you in mind. The Hebbal–SilkBoard underground Tunnel is set to transform your daily commute." He stated that the 16.75 km signal-free tunnel would allow commuters to bypass over 25 traffic bottlenecks, saving more than 45 minutes of travel time daily. The route would also provide direct access to the city’s IT corridor, he added.

"A faster, smarter Bengaluru is on its way — because you deserve better," said Shivakumar, who holds the Bengaluru Development portfolio.

However, the proposal came under sharp criticism from BJP MP Tejasvi Surya, who dismissed the project as unscientific and financially unviable.

In a reply post on 'X', Surya alleged that the tunnel road would cater only to four-wheelers and impose a toll of Rs 600 per journey.

"The Bengaluru Tunnel Road is yet another instance of the Congress government systematically destroying public transport in the city," he said.

"From the word go, the Hebbal–Silk Board tunnel idea has been riddled with problems," he added.

Surya alleged that the Detailed Project Report (DPR), prepared at a cost of Rs 9.5 crore, was done by a consultant who had previously been blacklisted elsewhere, and large parts of the DPR were copied from another report.

Calling the tunnel project “an unscientific solution to Bengaluru’s mobility issues,” Surya said it was bound to fail, wasting Rs 18,000 crore of taxpayers’ money.

He also pointed out that the state government plans to bear an additional Rs 7,200 crore as part of the 40% Viability Gap Funding to make up for the project's poor revenue outlook.

"Thank you, D K Shivakumar, for neglecting crucial civic issues such as potholes, underfunding public transport, delaying Metro projects, withholding the Fare Fixation Committee report, and pushing forward with an unscientific project," Surya said sarcastically. 

(This report has been published as part of the auto-generated syndicate wire feed. Apart from the headline, no editing has been done in the copy by ABP Live.)

Top Headlines

US Seizes Russian-Flagged Oil Tanker Linked To Venezuela After Dramatic Pursuit In Atlantic: WATCH
US Seizes Russian-Flagged Oil Tanker Linked To Venezuela After Dramatic Pursuit: WATCH
X Responds To Govt Over Misuse Of AI Tool Grok: Sources
X Responds To Govt Over Misuse Of AI Tool Grok: Sources
Delhi HC Issues Big Directive On Survey Of Encroachments Around Jama Masjid
Delhi HC Issues Big Directive On Survey Of Encroachments Around Jama Masjid
Turkman Gate Case: First Pictures Of Accused Surface; Kasif, Kaif, Arib, Adnan & Sameer Arrested
Turkman Gate Case: First Pictures Of Accused Surface; Kasif, Kaif, Arib, Adnan & Sameer Arrested

Videos

Delhi News: Why Bulldozer Action Was Conducted at Night? DCP Nitin Valson Explains Key Reasons
Delhi News: Cold Wave Intensifies Across North India, Capital Records Coldest Day of the Year
Delhi News: MCD Removes Encroachment Near Faiz-e-Ilahi Mosque After Stone Pelting, Area Secured
Delhi News: Illegal Encroachment Near Faiz-e-Ilahi Mosque Cleared, Mosque Declared Safe Amid Public Fear
Delhi News: FIR Registered Over Objectionable Slogans at JNU, University to Expel Involved Students

Photo Gallery

25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Embed widget