Explorer

Gaganyaan TV-D1: Crew Module Of First Uncrewed Flight Successfully Splashes Down In Bay Of Bengal

Gaganyaan TV-D1: The first developmental flight test, known as the TV-D1 mission, was launched on October 21, 2023, at 10:00 am IST. It demonstrated the performance of the Crew Escape System. 

Gaganyaan TV-D1: The Crew Module of the first developmental flight test of the Indian Space Research Organisation's (ISRO's) Gaganyaan programme has successfully splashed down in the Bay of Bengal. The first developmental flight test, known as the TV-D1 mission, was launched on October 21, 2023, at 10:00 am IST. Gaganyaan's TV-D1 mission is important because it demonstrated the performance of the Crew Escape System. 

ISRO said in a mission update on X (formerly Twitter) that the Crew Escape System performed as intended, and that the Gaganyaan mission has started on a successful note. 

An in-flight abort of the Crew Escape System was demonstrated, which means that while the Crew Module was in the air, the Crew Escape System was jettisoned. This allowed ISRO to check certain flight parameters, and whether the Crew Escape System can be effectively separated from the Crew Module to save the lives of astronauts in case a mishap occurs. ISRO aims to conduct more test flight missions in the future. 

ISRO aborted the TV-D1 mission at Mach number 1.2, which means that at the time of abort, the speed of the Crew Module was 1.2 times the speed of the sound in air.

The reason why ISRO aborted the TV-D1 mission at Mach number 1.2 is that it is at this stage that the spacecraft is expected to experience the greatest challenge, in terms of vibration and other parameters. Therefore, if any anomalies are likely to occur, they will probably occur at this stage. Mach number 1.2 is about 360 metres per second. Once the Crew Module achieved this speed, the abort command was given. The role of the Crew Escape System was to safely pull out the Crew Module from the launch vehicle, so that the Crew Module and the Crew Escape System could go in a direction different from that of the launch vehicle.

As part of the TV-D1 mission, the subsystems of the test vehicle were also evaluated. The deceleration systems of the Crew Module were tested at higher altitudes. 

For this mission, an unpressurised Crew Module was used, unlike the crewed mission of the Gaganyaan programme, in which a pressurised crew module will be used. Both the pressurised and unpressurised versions have the same mass and size, and are equipped with the same systems for deceleration and recovery, including complete sets of parachutes. 

In the crewed flight test of Gaganyaan, Earth-like atmospheric pressure conditions will be simulated.

Top Headlines

BJP Releases List Of Candidates For Upcoming Rajya Sabha Elections
BJP Releases List Of Candidates For Upcoming Rajya Sabha Elections
‘Will Continue To Work Together’: PM Modi After Meeting Venezuela’s Delcy Rodriguez As Oil Crisis Deepens
‘Will Continue To Work Together’: PM Modi Meets Venezuela’s Delcy Rodriguez
Annamalai Likely To Resign From BJP Tomorrow: Sources
Annamalai Likely To Resign From BJP Tomorrow: Sources
Monsoon Reaches Kerala, Will Advance Towards Goa And Maharashtra In 2-3 Days
Monsoon Reaches Kerala, Will Advance Towards Goa And Maharashtra In 2-3 Days

Videos

Patna Firing Case: Police Detain Two Guards Linked to Khan Sir’s Coaching Centre After Viral Video
Breaking: Delhi Hotel Blaze, Muzaffarpur ICU Fire and Hyderabad Market Inferno Raise Alarms
Hyderabad Fire: Massive Blaze Erupts at Commercial Complex in Ameerpet, Firefighters Rush to Contain Flames
BREAKING: Delhi Fire Exposé Reveals Unsafe PGs, Basement Rooms and No Exit Systems in Malviya Nagar
BREAKING: Delhi Hotel Fire Preliminary Probe Points to Short Circuit, Exit Lapses Exposed

Photo Gallery

25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Embed widget