Explorer

Kudankulam Nuclear Power Plant’s Four 1000 MW Units To Be Completed By 2027: Union Minister Jitendra Singh

“On their progressive completion, the full capacity of the Kudankulam site of 6000 MW is expected to be reached by the year 2027,” he said.

Chennai: The remaining four 1000 MW units of Kudankulam Nuclear Power Plant will be completed by 2027, said Jitendra Singh, Union Minister of State (Independent Charge) Science & Technology, Atomic Energy and Space.

In a statement laid on the table of the Rajya Sabha in reply to a question, Jitendra Singh as per PBI said, “At present, Kudankulam Nuclear Power Plant Units 1 and 2 of 1000 MW capacity each are already in operation and the remaining four units of 1000 MW each are under construction.”

“On their progressive completion, the full capacity of the Kudankulam site of 6000 MW is expected to be reached by the year 2027,” he said.

The projected installed capacity of the Kudankulam site is 6000 MW, comprising of six nuclear power reactors of 1000 MW capacity each.

Singh said, “ The first two units i.e. KKNPP-1&2 (2X1000 MW) are in operation and the remaining four units i.e. KKNPP-3&4 (2X1000 MW) and KKNPP-5&6 (2X1000 MW) are under construction.”

“The power generated by nuclear power plants (including Kudankulam nuclear power plants) is allocated by the Ministry of Power (MoP) to the various beneficiary States / Union territories in the region from time to time,” he said. 

Also Read | Cyclone Mandous To Hit Coast Around Mahabalipuram, NDRF Teams Deployed In Tamil Nadu — 10 Points

The Minister said: “The state of Kerala has a firm allocation of 266 MW from KKNPP-1&2 apart from the unallocated quota. Presently the state of Kerala has a share (firm plus unallocated) of 13.48% from KKNPP-1 (1000 MW); 13.30% from KKNPP-2 (1000 MW). With regard to the allocation of power from units under construction, i.e. KKNPP-3&4 (2X1000 MW); KKNPP-5&6 (2X1000 MW).”

Lastly, he said, MoP will take a decision and communicate at an appropriate time.

The Kudankulam Nuclear Power Plant was set up despite the opposition of the people in Tirunelveli district.

View More
Advertisement
Advertisement
25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Advertisement

Top Headlines

PM Modi Receives Kuwait's Highest Honour 'The Order Of Mubarak Al Kabeer'
PM Modi Receives Kuwait's Highest Honour 'The Order Of Mubarak Al Kabeer'
Epigamia Co-Founder, Rohan Mirchandani, Passes Away From Cardiac Arrest: Report
Epigamia Co-Founder, Rohan Mirchandani, Passes Away From Cardiac Arrest: Report
Kharge Accuses Modi Govt Of ‘Frontal Attack On Constitution, Democracy’ Over Election Rule Amendment
Kharge Accuses Modi Govt Of ‘Frontal Attack On Constitution, Democracy’ Over Election Rule Amendment
Stepwell, Likely 150-Year-Old, Found During Excavation In UP's Sambhal
Stepwell, Likely 150-Year-Old, Found During Excavation In UP's Sambhal
Advertisement
ABP Premium

Videos

Mamata Machinery IPO Opens for Subscription, Closes on Dec 23, Expected Listing on Dec 27Complete Farmer Registry Update by Dec 31 to Receive PM Kisan 9th InstallmentWoman Dies in Mohali Building Collapse, Rescue Operations UnderwayHuge Black Money Seized in Madhya Pradesh Lokayukta Raids, Over Rs 7.98 Crore Discovered

Photo Gallery

Embed widget