Explorer

Army, BRO Restore Connectivity In Landslide-Hit Uttarkashi With New Bailey Bridge

Indian Army and BRO complete Bailey bridge at Limchigad in Uttarkashi after cloudburst destroyed original, restoring connectivity and aiding relief efforts for stranded residents.

Uttarkashi, Aug 11 (IANS) The Indian Army, in coordination with the civil administration, has completed the construction of a Bailey bridge in Limchigad, restoring connectivity after the original bridge was washed away in the August 5 cloudburst in Uttarkashi's Dharali.

Following the destruction of the Limchigad bridge, transportation in the region came to a standstill, prompting urgent restoration efforts.

Teams from the police, State Disaster Response Force (SDRF), engineers, and other rescue units, along with the Indian Army's engineering wing from the Bengal Engineers Group (BEG), worked round the clock despite heavy rainfall to restore connectivity through the bridge.

Search, medical, and communication teams also joined the mission, culminating in the completion of the 90-foot Bailey bridge at 5 p.m. on Sunday.

The Border Roads Organisation (BRO) and Army engineers carried out the construction. Located on the Gangotri National Highway, the new bridge spans the Limchigad between Gangnani and Dharali, with a load capacity of nearly 50 tonnes, significantly boosting relief and rescue operations in the challenging Himalayan terrain.

Uttarakhand Chief Minister Pushkar Singh Dhami, in a post on X, stated, "The construction work of the Bailey Bridge at Limchigad has been completed, and the bridge has been opened for traffic. Now, through this bridge, not only are relief materials and machinery being sent forward quickly, but the movement of local people has also resumed smoothly. In this difficult time of disaster, our government is working with full commitment to normalise public life."

Authorities are simultaneously working on clearing blockages along the highway at Songad, Dabrani, Harsil, and Dharali at a rapid pace.

However, heavy rain is hindering helicopter evacuations of stranded individuals.

Since the start of evacuation operations on Wednesday, 1273 people have been airlifted by Sunday evening from Dharali and Harsil.

 

(This report has been published as part of the auto-generated syndicate wire feed. Apart from the headline, no editing has been done in the copy by ABP Live.)

Top Headlines

Rampur CRPF Attack Case: Mohammad Sharif, Whose Death Sentence Was Overturned, Shot Dead
UP: Rampur CRPF Camp Attack Accused Mohammad Sharif Shot Dead By Unidentified Men
Chhath Puja 2026: Delhi Govt Announces Public Holiday On November 16
Chhath Puja 2026: Delhi Govt Announces Public Holiday On November 16
Delhi's Diwali Pollution Data Reveals Shocking Spikes, But Key Gaps Still Remain
Delhi's Diwali Pollution Data Reveals Shocking Spikes, But Key Gaps Still Remain
Sunil Tatkare To Send Legal Notice After Ramdas Kadam Links Him To Ajit Pawar Crash Probe
Sunil Tatkare To Send Legal Notice After Ramdas Kadam Links Him To Ajit Pawar Crash Probe

Videos

Maharashtra UCC Row: Asaduddin Owaisi Calls Proposed Code a Hindu Civil Code, Questions Survey Today
Maharashtra News: Political Battle Erupts Over Gokul Chairman Election as Congress Challenges Mahayuti
Political News: Rahul Gandhi Challenges PM Modi to Debate Over 'Ideological Naxalism' Remark
Fire Alert: Massive Blazes Hit Ghaziabad, Panchkula, Damoh and Basti, Property Worth Lakhs Destroyed
Sonia Gandhi Book Launch: 'Belongings: A Journey of Love' Reveals Untold Gandhi Family Stories

Photo Gallery

25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Embed widget