Explorer

New Date For NASA Artemis I Launch Soon. Know Why It Was Put Off

The launch of Artemis I on Monday, August 29, was scrubbed due to a technical problem with one of the engines of the Space Launch System (SLS) rocket.

The launch of Artemis I on Monday, August 29, was scrubbed due to a technical problem with one of the engines of the Space Launch System (SLS) rocket. As a result, the first leg of NASA’s Moon mission has been postponed. 

NASA said in a mission update that the US space agency will keep everyone posted on the timing of the next launch attempt.

The launch director halted Monday's launch attempt of Artemis I at approximately 8:34 am EDT (6:04 pm IST). 

After the launch of Artemis I was called off on Monday, NASA said that Artemis teams are working through an issue with engine number 3 of SLS, and expect to give a news briefing soon.

A few hours before the launch attempt, NASA engineers were troubleshooting a conditioning issue with one of the RS-25 engines of the SLS, the world's most powerful rocket. Launch controllers increased the pressure on the core stage tanks to condition the engines, and to cause some of the cryogenic propellant to bleed to the engines. This is an important step because it ensures the engines can reach the proper temperature range to get started.

However, NASA teams observed an issue with the bleeding of engine number 3. As a result, the mission was scrubbed. 

Josef Aschbacher, the Director General of the European Space Agency (ESA), wrote on Twitter that launches are always "better safe than sorry". He further said that it is important the launch teams feel "100% comfortable" with launch, every time, and there should be no exceptions. He added that he is confident there will soon be a new launch date for Artemis I. 

In a media briefing following the scrub, NASA Administrator Bill Nelson said: "We don't launch until it is right."

Nelson explained that NASA teams observed a problem with the engine bleed. He also said that Artemis I is a very "complicated mission", and has complicated systems, all of which have to work. 

"You don't light the candle until it's ready to go," Nelson said.

View More
Advertisement
Advertisement
25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Advertisement

Top Headlines

Former Andhra Pradesh Congress President Dharmapuri Srinivas Passes Away
Former Andhra Pradesh Congress President Dharmapuri Srinivas Passes Away
Tamil Nadu CM Stalin Urges States Under INDIA Partners To Pass Resolution To Abolish NEET
Tamil Nadu CM Stalin Urges States Under INDIA Partners To Pass Resolution To Abolish NEET
UP: Three Kids Dead After Under-Construction Building's Wall Collapses On Them In Greater Noida
UP: Three Kids Dead After Under-Construction Building's Wall Collapses On Them In Greater Noida
Delhi: Worker's Corpse Fished Out Of Flooded Pit Of Under-Construction Building, Search On For More Bodies
Delhi: Worker's Corpse Fished Out Of Flooded Pit Of Under-Construction Building, Search On For More Bodies
Advertisement
ABP Premium

Videos

JDU Executive Meeting: 'Sanjay Jha To Become JDU National Executive' Says Sources | ABP NewsWeather News: Wall Falls Due To Heavy Rains In Greater Noida, 3 Children Lost Lives | ABP NewsDelhi Airport Roof Collapse Kills One, Injures Six | ABP NewsLand Scam Case: Former Jharkhand CM Hemant Soren Gets Bail | ABP News

Photo Gallery

Embed widget