Explorer
Advertisement
India receives first inland cargo vessel | Master Stroke
The second project includes three sewage pumping stations at Chaukaghat (140 MLD), Phulwaria (7.6 MLD) and Saraiya (3.7 MLD). The total cost for the three pumping stations was Rs 34.01 crore.
Another project is the construction of 28 km long relieving trunk sewer, rising mains and interceptor sewers along Varuna & Assi at a cost of Rs 155.87 Crore.
The Prime Minister also laid the foundation stone for Sewerage Management Scheme for Ramnagar at a cost of Rs 72.91 Crore. This will include a 10 MLD STP and interceting and diverting four drains.
Another project is the construction of 28 km long relieving trunk sewer, rising mains and interceptor sewers along Varuna & Assi at a cost of Rs 155.87 Crore.
The Prime Minister also laid the foundation stone for Sewerage Management Scheme for Ramnagar at a cost of Rs 72.91 Crore. This will include a 10 MLD STP and interceting and diverting four drains.
India
Celebrations All Across The Country As Team India Reaches It's Homeland | ABP News
ABP Exclusive: 'Bhole Baba Is 8th Pass' Says Bhole Baba's Friend Rajendra Maurya | ABP News
Hathras Satsang Stampede: Know What All Happened So Far In The Case? Watch EXCLUSIVE Report
Hathras Stampede: What Is 'Bhole Baba's' Connection To NEET paper Leak? Watch Full Report | ABP News
Security Force Of 'Bhole Baba' Told People To Stop Recording, Watch Inside Video | ABP News
View More
Advertisement
Advertisement
Advertisement
Top Headlines
UP UK
World
Technology
UP UK
Advertisement