Explorer

Andhra Pradesh To Set Up World's Largest Integrated Renewable Energy Storage Project In Kurnool

CM YS Jagan today performed the first concrete pour ceremony of the world’s largest Integrated Renewable Energy Storage Project (IRESP) being implemented by Greenko Group at Kurnool District.

Hyderabad: Andhra Pradesh CM YS Jagan Mohan Reddy on Tuesday performed the first concrete pour ceremony of the world’s largest Integrated Renewable Energy Storage Project (IRESP) being implemented by Greenko Group at Kurnool District, Andhra Pradesh. The 5,230 MW Integrated Renewable Energy Storage Project will play a pivotal role in India attaining energy security and enabling global energy transition.

This is the first of its single kind location energy storage project with wind and solar capacities. This project is being implemented with an investment of over USD 3 billion, comprising Pumped Storage (10,800 MWh of daily storage), Solar (3000 MW) and Wind (550 MW).

Also read | Telangana Police Rescue Kidnapped 27-Day-Old Boy In Warangal

"It’s a moment of great pride for Greenko that we have pioneered to deliver, ahead of global ambition of a 24/7 dispatchable renewable energy solution, for industrial decarbonization and energy transition," Greenko Group founder, CEO & MD, Anil Chalamalasetty said, according to a release.

The Greenko Group founder credited this to national policy backing and the visionary leadership of the Chief Minister, developing the state into a sustainable manufacturing hub.

Anil said Andhra Pradesh is on track to become India's energy storage centre, thanks to the state's favourable topography for Pumped Storage Plants (PSPs). This integrated solution is critical for the country to become energy self-sufficient and a leader in decarbonized economies.

Greenko has pioneered the concept of storing contracts with central utilities and large companies with this project. Anil expects the project to be operational by the fourth quarter of 2023.

Greenko Group is the World’s largest Renewable Energy Storage and leading Energy Transition & Decarbonization solutions company. Greenko with an installed Renewable Energy capacity of 7.5 GW across Wind, Solar and Hydro capacities have 10 GW of projects under development.

Top Headlines

‘We Are Waiting For Them’: Iran Throws Down Challenge To US On Ground Invasion
‘We Are Waiting For Them’: Iran Throws Down Challenge To US On Ground Invasion
Priyanka Gandhi Slams Himanta Sarma, Alleges ‘One Family’ Control Over Assam Resources At Nazira Rally
Priyanka Gandhi Slams Himanta Sarma, Alleges ‘One Family’ Control Over Assam Resources
Trump Threatens NATO Exit, Calls Alliance ‘Paper Tiger’; Starmer Says UK Won’t Join War
Trump Threatens NATO Exit, Calls Alliance ‘Paper Tiger’; Starmer Says UK Won’t Join War
PM Modi Targets Assam Hat-Trick, Uniform Civil Code Push With Tribal Safeguards Takes Centre Stage
PM Modi Targets Assam Hat-Trick, Uniform Civil Code Push With Tribal Safeguards Takes Centre Stage

Videos

Breaking News: Iran Moves to Impose Tax on Strait of Hormuz Shipping
Breaking News: World Awaits Trump’s Next Move on Middle East Conflict
War Alert: Trump Signals Exit from Iran War Without Deal
Breaking News: Massive Blaze Erupts in Surat Nylon Factory, Thick Smoke Engulfs Area, Firefighting Underway
Missile Fury Escalates: Iran Hits Israeli Cities as US Boosts Military Presence in Gulf Region

Photo Gallery

25°C
New Delhi
Rain: 100mm
Humidity: 97%
Wind: WNW 47km/h
See Today's Weather
powered by
Accu Weather
Embed widget