Bihar: Approach road of flyover sinks due to rain
ABP News Bureau
Updated at:
24 Jul 2020 10:41 AM (IST)
Download ABP Live App and Watch All Latest Videos
View In App
In Bihar's Gopalganj the approach road of a flyover constructed 4 years back sink due to heavy rain. As soon as the incident was reported, the administration started the work.
The inaugration of the flyover was done was the Chief Minister of Bihar on 13 March 2016. The approach roads of this flyover could not sustain the heavy rains and gt sink. Bihar is facing floods these days due to heavy rains and the locals of the state are facing various problems due to it.
The inaugration of the flyover was done was the Chief Minister of Bihar on 13 March 2016. The approach roads of this flyover could not sustain the heavy rains and gt sink. Bihar is facing floods these days due to heavy rains and the locals of the state are facing various problems due to it.