Noida Twin Tower Demolition : Authority completes final review, towers to be razed on 28th August
ABP News Bureau
Updated at:
26 Aug 2022 01:00 PM (IST)
The demolition team tasked to bring down the illegally constructed high-rises have drilled 9,642 holes on the pillars of the buildings in which over 3700kgs of explosives have been stuffed. Stay connected for more updates.