Uttarkashi Tunnel Collapse: Drilling Process Started, 800 MM pipe to install inside the tunnel
ABP News Bureau
Updated at:
24 Nov 2023 05:37 PM (IST)
Download ABP Live App and Watch All Latest Videos
View In AppA pipe of 800 MM is to be installed inside the tunnel to rescue the 41 trapped workers from the last 13 days inside the Silkarya tunnel. The drilling process have been started again after repairing the snag in the machine. The rescue operation is likely to end by Friday evening. Stay tuned for more updates on ABP News.